ELECTRICAL PANEL UPGRADE • CARMEL, INDIANAPOLIS & MARTINSVILLE

Panel upgrades for homes adding an EV charger, a Powerwall, or a remodel

Serving Carmel, Zionsville, Westfield, Indianapolis, Martinsville, and homes across Indiana

An electrical panel upgrade replaces the breaker panel that feeds every circuit in your home, and sometimes the service coming in from the utility, so the house can safely carry what you’re adding. We check yours on the first visit and tell you plainly whether it needs one.

BEFORE WE REPLACE ANYTHING

If your panel is fine, we'll tell you it's fine

Most of the panel upgrades we do start with something bigger, like an EV charger, a Tesla Powerwall, a hot tub, or a kitchen remodel. On the first visit, we run a load calculation, which adds up what your home already uses and what you’re planning to add, and that tells us whether your panel can carry it. Sometimes the answer is one new circuit instead of a new panel, and that’s what we’ll quote.

WHY GROUNDED SOLUTIONS

A panel recommendation you can trust

grounded solutions icon 1

No commission on panels.

Nobody on our crew earns more for recommending a bigger panel or a smart one.

grounded solutions icon 15

Every part of the job on its own line.

The panel, any service work, the permit, and the utility coordination are listed separately on your quote.

grounded solutions icon 3

Certified for what comes next.

We’re SPAN Panel, Tesla Powerwall, and Qmerit certified, so your panel is planned around the charger or battery you add later.

53a65345044f2d8e07216c32aed9d6d0d21ab00d

You'll know who's in your home.

You’ll know the name of the electrician coming out, and we label every circuit before we leave.

WHEN TO UPGRADE

When an electrical panel upgrade makes sense

Wall-mounted Level 2 EV charger in a home garage

Adding an EV charger or a Powerwall.

Big new loads are the most common reason. If the panel is out of capacity or breaker spaces, we size the upgrade for the EV charger and anything else on your list, so the panel work only happens once.

Old fuse panel with screw-in fuses inside a rusted metal box

An older Federal Pacific, Zinsco or fuse panel.

Home inspectors and insurers often flag these because of concerns about breakers that may not trip when they should. If you have one, we’ll look at it and quote the replacement.

Framed home addition with new electrical boxes and wiring

A remodel or addition on 100-amp service.

Many older homes still run on 100 amps. A remodel, an addition or a new heat pump is usually the time to move to 200. Just adding a charger? You may not need to.

Scorched circuit breaker inside an electrical panel

A panel that's warm, buzzing or scorched.

Don’t wait on this one. Call (317) 834-1922, and we’ll answer 24/7.

lightbulb lightning white

"If you have an older home with only 100 amp service, you can still install a 240 volt circuit. There are three different settings on most chargers you can choose from, and they draw anywhere from 32 to 48 amps. So, even in an older home, we will still try to make it work."

– Clay Hamilton, President

YOUR OPTIONS

Panel replacement, 200 amp upgrade, or smart panel

The load calculation from your first visit decides which of these fits your home.

Panel replacement.

A new breaker panel at the same service size. It fits when your panel is outdated, damaged or out of spaces but the home has enough capacity.

200 amp service upgrade.

This raises how much power your home can draw from the utility, usually from 100 to 200 amps, with a new meter base and main panel. Larger homes with several big loads sometimes need more, and the load calculation will show it.

SPAN smart panel.

It does everything a standard panel does and shows real-time use for each circuit in an app, where you can switch circuits and pick which ones stay on during an outage with a battery. It costs more, so we recommend it when you’re adding a Powerwall, solar or more than one EV charger.

HOW IT WORKS

From first visit to final inspection

Site visit and load check

We look at your panel, your service, and what you're adding.

1
Line-item quote

On a quoted job, the price is the price. If we open a wall and find something nobody could see, we stop and talk it through with you first.

2
Permit and utility

We pull the permit and schedule the power disconnect and reconnect with AES Indiana or Duke Energy.

3
Installation day

Your power is off for a couple of hours while we swap the panel, and we'll plan the day with you ahead of time.

4
Inspection and walkthrough

The inspector signs off, and we show you the new panel with every circuit labeled.

5

REVIEWS

Homeowners on working with our electricians

FAQ

Electrical panel upgrade questions

How long does a panel upgrade take?

Most panel replacements take one day, with the power off for part of it. A service upgrade can take longer because the utility has to disconnect and reconnect your power, and we schedule that ahead of time.

Do I need a 200 amp panel for an EV charger?

Not always. Many homes on 100-amp service can add a Level 2 charger after a load calculation, sometimes with the charger set to a lower amperage. We run the numbers on the first visit and tell you which applies.

Do I need a permit for a panel upgrade?

Yes. Panel and service upgrades need an electrical permit and an inspection. We pull the permit, schedule the inspection and put both on your quote.

Will a new panel let me add a Powerwall or solar later?

It can, if we plan for it. Tell us what's on your list, and we'll size the panel so the next project doesn't mean redoing it.

Tell us what you're adding, and we'll tell you what your panel needs.

We’ll set a time to look at it and send a quote that breaks the work into line items.